36887 Mensajes en 36850 Temas - por 5846 Usuarios - Último usuario: FreyaWum62

* Chat Sentinela

Refresh History

Autor Tema: High-pressure metering box meter installation description - Product - Baoding He  (Leído 63 veces)

jingwxs04

  • Jr. Member
  • **
  • Mensajes: 71
    • Ver Perfil
meter installation requirements is how, under detailed below .
 meter should be mounted vertically voltage transducer in a high-pressure metering box , shall not be installed in the active door , install meter space should meet the following requirements :
 meter and meter horizontal spacing between not less than 80mm
 single phase energy meter minimum distance apart is 30mm
 Pingbian meter with the minimum distance should be greater than 40mm
 junction box with vertical distance of at least 80mm
 meter should be installed in the ground 0.8m ~ 1.8m height ( from ground horizontal centerline table size )
 meter from the ground shall not be less than 600mm
 meter should be vertical , securely mounted , all fixed Luo bolt holes shall be fixed mounting holes should be threaded holes or other means to ensure that a single person will be able to work in a cubicle front fastening bolts .
 Table centerline inclination in all directions is less than 1 .
 installed in the metering panel meter , shall be affixed to "× × kV × × line power meter " ; provided with primary and secondary table should be set error smaller meter main table .
 the hall effect transducer installation of the measuring device on the client , to be affixed at its mounting location classification label electricity .
 meter installation requirements above , please read.
 
相关的主题文章:
 
 
   http://bamchannel.net/forum/3-suggestion-box/1109-ups-battery-maintaining-the-status-quo-and-solutions-518#1109
 
   http://bbs.taojiaxiao.com/home.php?mod=space&uid=470770

 

SimplePortal 2.3.4 © 2008-2011, SimplePortal