36809 Mensajes en 36772 Temas - por 2106 Usuarios - Último usuario: MaribelEas

* Chat Sentinela

Refresh History

Autor Tema: Construction contract (International) - China education resource network constru  (Leído 50 veces)

bbavyhmhl

  • Full Member
  • ***
  • Mensajes: 116
    • Ver Perfil
International Contract for works of civil engineering construction
 
 employer:
 
 contractor:
 
 project and related documents:
 
 both sides through friendly consultations,said loudly it was, reached the following terms: < br> first part of the common condition of
 
 definition and interpretation of
 
 
 
 defined in Clause 1 of this contract (as defined hereinafter provided) the following words and in the parlance,air jordan, except where the context otherwise requires otherwise,louboutin pas cher, shall have the meaning which it has under the here:
 
 (1) "employer" refers to the specified conditions of contract in the second part, has been on the project construction,louboutin, installation or delivery of tender and one will hire a contractor and the employer's legitimate heir, but not (except with the consent of the Contractor) any assignee of employer.
 
 (2) "Contractor" refers to the tender has been accepted by the employer of the person or persons,abercrombie france, firm or company, personal representatives,FitFlops Uk, and including the Contractor's successors and permitted assigns.
 
 (3) "engineer" means the person designated by the Engineer in the second part, or by the employer at any time assignment and notify the contractor in writing for the purpose of this contract to replace the specified engineer to act as the Engineer engineer.
 
 (4) "engineer's representative" means the resident engineer or engineer assistant,louboutin pas cher, or any by the employer or the engineer, at any time to perform specified in this document second duty construction administrator, the authority shall notify the contractor engineer.
 
 (5) &quot,louboutin pas cher;works" means the works in accordance with the provisions of this contract shall be,hollister uk.
 
 (6) "contract" means the conditions of contract,hollister,will face eliminati, specification, drawings, bill of quantities, the price of the schedule of rates and prices (if any),converse pas cher, the tender and the contract agreement.
 
 (7) "the contract price" means the tender specified,need a strong heart, but according to the below stated to increase or decrease the amount.
 
 (8) "construction facilities" refers to the project or temporary works (as defined in the following) is required for maintenance, built or all equipment or and so on properties of each object, but does not include the intended to form or forming part of the permanent works or other materials fabric.
 
 (9) "temporary works" means the works for, the required maintenance completed or all temporary works of every kind.
 
 (10) "drawings" is mentioned in the specification drawings and any written approval by the engineer of such modifications,abercrombie, and engineers to provide written approval drawings or other.
 
 (11) "site" means the, under which the project or land and other places,louboutin, as well as any by employers for the purpose of this contract and the contract specified together with other land or place other places for site provided.
 
 (12) "approved" means approved in writing, including subsequent written confirmation for verbal approval earlier; and "approval"

 

SimplePortal 2.3.4 © 2008-2011, SimplePortal